Overview
-
ID No
17380 -
Type
Grunts -
Parking
Yes -
Purpose
Sell -
Location
Ekke, Lükati küla
About This Listing
Residential plots for sale in Anija vald, between Kehra and Kose.
A residential building and outbuildings can be built on the plot (more precisely, the right to build will be determined by submitting an application for design conditions to the rural municipality). The plots are mainly covered with forest.
A good road belonging to the parish leads to the plot, which is always well-groomed and cleaned in winter.
The price of the plot includes: a) connection to electricity 3 * 16A, b) connection to water and c) roads to the site with unpaved surface
Sewerage is provided locally
Address | cadastral number | area m2 | price € | price/m2 |
Kuuse tee 1 | 14101:001:0698 | 6769 | 55 000 | 8.13 |
Kuuse tee 2 | 14101:001:0696 | 14179 | 80 000 | 5.64 |
Kuuse tee 4 | 14101:001:0697 | 8347 | 60 000 | 7.19 |
Männi tee 1 | 14101:001:0695 | 14464 | 75 000 | 5.19 |
Männi tee 2 | 14101:001:0692 | 16518 | 85 000 | 5.15 |
Männi tee 3 | 14101:001:0694 | 13058 | 75 000 | 5.74 |
Männi tee 4 | 14101:001:0693 | 19337 | 90 000 | 4.65 |
Architectural and construction requirements for the construction project in accordance
with the requirements established in the region for the style of the building and the general layout:
(1) Purpose of use:
Residential and auxiliary building
(2) Maximum number of buildings on a land plot:
one residential building and four auxiliary buildings
(3) Location:
at least 100 m from the neighboring house, at least 4 m from the border of the plot, at least 27 m from the Kaunissaare-Kiviloo road.
(4) Maximum Permitted Construction Area:
According to the project
(5) height and, if necessary, depth:
Maximum height 9 m
(6) architectural, construction and design conditions:
traditional buildings, roof slope 20-45 degrees.
(7) the possible location of the building necessary for the maintenance of buildings located on land or on water:
All engineering networks and access roads must be shown on the plan. In the project, it is necessary to resolve the issue of the order of the Minister of Internal Affairs of 18.02.2021 on the fire water intake point, which meets the requirements of Chapter 2 of Rules No 10.
8) the need to conduct construction studies:
Topographic and geodetic plan of the foundation within the yard area
9) Principles of improvement, maintenance and management of traffic:
Possibility of access from Kaunissaare-Kiviloo Road (Road No 1401017) or from Kuuse Road Preservation of the PÜ-404 drainage system (open type).
Water supply is solved locally.
This is an area with poorly protected groundwater, where up to 5 m3 of wastewater (daily discharge) into the soil after mechanical treatment of wastewater (septic tank + sedimentation tank) is allowed if only domestic wastewater that does not contain wastewater from the water plant is treated. If it is also desirable to discharge wastewater from a watery toilet into the soil, then it is allowed to enter the soil up to 10 m³ of wastewater per day after biological wastewater treatment (biotreatment plant + reservoir).
It is also possible to put into operation a sealed collection tank. When establishing a self-treatment plant, comply with the rules of local wastewater treatment and disposal of Anija rural municipality and reflect them in the construction project; provide the information and documents required by Section 5 of the Rules.
If the radius of influence (50 m) of the self-cleaning impregnation system extends to the neighboring plot, the approval of the owner of the neighboring plot must be submitted.
The agreement should be carried out in addition to the plan, which also indicates
the radius of influence of the self-cleaning system.
After receiving approval, the owner of the neighboring property must confirm that he
is aware of and agrees within the self-cleaning system’s radius of influence on his property and that he is aware that he does not have the ability to build wells within the radius of the self-cleaning system.
The well must remain at a distance of at least 60 m (including from the wells of neighboring areas) from the self-cleaning system.
In the construction plan, it is necessary to specify how construction waste will be managed in accordance with the waste management rules (estimated amount of waste and classification in accordance with the current list of wastes, explanations on the separate collection of waste at the construction site, waste management operations and sites, etc. in Anija municipality.
Eelised
- Amenities Parking